Archive for the ‘LEED PIf4’ Category
LEED PIf4:Schedule and Overview Documents
Upload PIf4-1. Provide representative photos of the exterior of the building; with captions. If the project is in the design phase; upload a rendering and/or drawing. (Optional)
Project narrative: The Lohre LEED Project is a makeover of an existing residential apartment into an office.
You are currently browsing the archives for the LEED PIf4 category.